Waiting since 2012

The question

What do people need when they shape a CRM or an ERP to their own company, and where do today's products fail them?

Method 33 sources read on 13 November 2026: 17 public request boards, forums, trackers and threads with their counts and dates, 8 vendors' own documents, 4 official sources, 3 surveys and 1 peer-reviewed study.

Almost nobody runs a business on software exactly as it ships. In a consultancy's poll of ERP projects, 12% of respondents had changed nothing in theirs1. The rest add fields and kinds of record, change how documents follow one another, and then live with what that costs at every new version.

We read 33 sources for what people ask for when they shape the system, and where they are refused. Seventeen are the places where they ask in public: vendors' idea boards and forums, the issue trackers and add-on store of open products, and practitioners' threads, each with its counts and dates as the page showed them on 13 November 2026. Eight are vendors' own documents on limits, prices and upgrades. Four are official sources, three are surveys and one is a peer-reviewed study. A vote is not a sample: it counts the people who found the board and cared enough to click. So we read the counts for order and for age, and say where one product's board is all the evidence there is.

Key findings

  1. What people ask for most is to change how records relate, and the largest asks are the slowest to arrive. Of the ten most voted customization ideas on one CRM vendor's board, six were delivered only in part and two are marked not planned. The most voted of all, posted in 2006 with 125,570 points, is marked delivered in part, in a release of 20232.

  2. The work links lines; the software links documents. The best-selling add-on that merges deliveries and receipts of several orders in one ERP's store shows 271 purchases. A down-payment add-on shows 202 and progress billing 1363.

  3. Money in parts waits longest. On an accounting vendor's board, deposits on invoices have been asked for since March 2012 and progress payments since October 2012, with 516 and 252 votes. Both are still in development4.

  4. Customization is paid for at every upgrade. In one open-source ERP's community, 52.4% of 2,481 modules had been moved to the newest annual version one year after it came out5. The vendor's own terms say a database with custom modules cannot be upgraded until they are6.

  5. Limits are priced, and the price is often hidden. One vendor lists extra database capacity at USD 40.00 per GB a month7. Another allows between one and fifteen lookup fields per module in its paid editions, depending on which8.

  6. People will let AI act when a person can still correct it. In a 47-country survey of 48,340 people, 84% said they would trust an AI system more if a person can correct, override or challenge what it does9.

  7. On the phone, the first ask is to work without a connection. The top request of a work-management vendor's mobile board, with 4,432 votes, asks for offline use. It was posted in December 2020, and offline creation shipped in 202610.

Who changes the system, and why?

An owner, someone in operations, a partner and, less often, a developer. And the reasons are not only missing functions. A study of two companies that changed their ERP package recorded reasons well beyond a missing function. Some functions were absent. But the companies also wanted documents to look right to outsiders, fewer staff hours on daily work, and to keep "existing ways of work that were perceived of value"11.

The same split shows in practitioners' threads. In a long discussion among people who build and run ERP systems, a consultant called customization the most important thing about one, beyond adding fields: overriding how cost or price is worked out. The owner of a manufacturer said he wrote his own order system because nothing fit. Others said management prefers a bounded, predictable way to customize to open-ended changes to the code12.

Most of that work is bought. A consultancy's poll of 342 people who ran ERP projects between March 2016 and February 2017 found that 74% went over budget1. In the catalogue where UK public bodies buy implementation services, the rate cards of twelve suppliers price a business architect at GBP 650 to GBP 1,337 a day in the United Kingdom and GBP 180 to GBP 855 offshore13. One ERP vendor sells its own consultants' hours in packs from 25 hours for USD 2,400 to 200 hours for USD 15,00014.

What decides whether it works is not always the money. Asked to price a construction company's rollout, a member of one open-source ERP's forum answered that "successful deployments need an evangelist inside the company"; failed rollouts, he wrote, had handed a specification to an outside developer with nobody inside who understood the system15.

What do people ask for most?

To change how records relate to each other, and to have numbers that follow those relations. The largest board we read belongs to a CRM vendor and holds ideas back to 2006. Among its 50 most voted ideas of all time, ten are about shaping the system itself. Six were delivered only in part, two are marked not planned, and two were delivered in full2.

Figure 1

Of the ten largest asks to shape the system, two were delivered in full

The customization ideas among the 50 most voted on one CRM vendor's board, by points and by what was delivered

The customization ideas among the 50 most voted on one CRM vendor's board, by points and by what was delivered
MeasureGroupValue
A list of options shared by many fieldsDelivered in full44,790
Where a field is usedDelivered in full36,840
Rules that show, hide or require fields by their dataDelivered in part, or not planned125,570
Roll-ups with formulas, not fixed criteriaDelivered in part, or not planned76,290
Shared option lists for existing fields (not planned)Delivered in part, or not planned61,190
Roll-ups across any kind of linkDelivered in part, or not planned60,290
A button shown by profile (not planned)Delivered in part, or not planned45,700
Formatting of a field by its valueDelivered in part, or not planned38,700
Tabs shown by conditionDelivered in part, or not planned37,960
Fields of related records on a pageDelivered in part, or not planned35,520
Points on the vendor's idea board, read on 13 November 2026, for the ten ideas in its category for customization and app building among the 50 most voted of all time. Status as the board shows it; ideas marked delivered in part count as not delivered in full2. Points are votes, not a sample of customers.

The same requests appear on every board, in that product's own words. A person linked to more than one company: 64,360 points on the first board, delivered in 2016, nine years after it was posted2; 1,249 votes on a second CRM's board16; 123 likes on a third17. More lookup fields than the edition allows: 87 likes, posted in March 2015 and raised in July 202417. A value copied from a parent record that goes stale when the parent changes: 80 likes on one board and 82 votes on another, both open1718.

Formulas and roll-ups come next, and the complaint is that they are not current. A request that formulas recalculate without the record being edited drew 182 likes and 150 comments before it was delivered17. One vendor's documentation explains why such complaints arise: a roll-up column is first calculated 12 hours after it is created, then by a job that runs at most hourly, with 50 roll-ups to a table19.

  • Seeing what another person seesThe most liked idea of all 2,756 on one CRM board, 386 likes, asks that an administrator can see the system as a given user does. It was posted in March 2015 and is still marked as being worked on17. A second vendor's board has the same request twice, with 92 and 85 votes18.
  • Copying what was builtOn the same CRM board, cloning a whole kind of record has 192 likes and has been parked since 201917. On one open-source database, copying a built base to another installation is the most reacted issue, with 81 reactions20.

Why do lines matter more than documents?

Because goods, work and money move by the line, and most software links whole documents. A box arrives with twenty positions: five belong to one order, five to a second, ten to a third. The receipt is one document, and each of its lines answers to a line of a different order. The same happens on the way out, when one delivery or one invoice gathers lines of several orders, and in reverse, when one order is split across suppliers, warehouses or dates.

Where a product creates one delivery per order, people buy the rest. In one open-source ERP's add-on store, a search for merging deliveries and receipts returns 32 add-ons, and the best-selling shows 271 purchases at USD 13.40. Invoicing from deliveries returns 33, merging invoices 50 and merging purchase orders 633. The community that maintains free modules for the same product keeps modules to group deliveries of several orders, to invoice by delivery, and to link each invoice line to the delivery it came from5.

Figure 2

Joining and splitting lines is bought as an add-on

Purchases of the best-selling add-on for each ability, in one open-source ERP's add-on store

Purchases of the best-selling add-on for each ability, in one open-source ERP's add-on store
MeasureValue
Merge deliveries and receipts of several orders271
Down payments on purchase orders202
Invoice from a delivery149
Progress billing136
Returns against an order122
Merge invoices97
Merge purchase orders90
Split a sales order48
Revise a quotation34
Invoice from timesheets30
The store's own purchase counter of the best-selling add-on among the first results of each search, read on 13 November 2026; prices of these add-ons ran from USD 10.72 to USD 55.833. A purchase counts a sale, not a need, and the core product may do part of some of these.

Where a product can combine documents, the complaint moves to the line. On the same ERP's forum, a thread asking how to invoice lines of several orders has 17,288 views21. In another thread there, a customer refused a single invoice for ten deliveries until each line showed the number of its delivery note21. And an accounting vendor's board asks for the customer's purchase order number on invoices (220 votes) and on bills (176)4.

Splitting fails at the same place. Asked how to drop-ship part of one order line, a forum answer was blunt: "The shipping address is PO level and not PO line"21. On another open-source ERP, three threads posted from 2018 to 2023 say the same, and the advice is to split the line in two15. On a third vendor's board, a request about the order in which drop-shipped documents are posted has 184 votes and has been under review since January 201918.

  • Closing what is left of one lineA request to bill the quantity received instead of the quantity ordered, and close the order, has 43 comments and has been under review since August 2017; the vendor's reply that year was that it had no immediate plans to change the flow22. Another vendor answered a 54-vote request to close a partly shipped order that it is not on the roadmap18.
  • Returns and credit against chosen linesReturning goods and crediting money are often two acts, and people want each tied to the line it undoes. An add-on for returns shows 122 purchases at USD 55.833, and the free modules include one to credit only chosen lines of an invoice5.
  • A quote that changes, and a quote taken in partHow to revise a quotation has 30,421 views on one forum since 2013, and 27 paid add-ons answer it213. Copying part of a quote to an invoice has waited since September 2015, with 124 votes4.
  • Hours and expenses that become invoice linesAssigning purchase order lines to a project has 622 votes and was accepted in 2017, with no date given4. Turning timesheets into invoice lines has been an open request on one open-source tracker since 202123.

Substitution, delivering another item in place of the one ordered, is the one case with little demand on record: no request we found had more than eight reactions or votes2318.

What happens when the money comes in parts?

It waits the longest of anything we read, and it is where industry differs most. On an accounting vendor's board, deposits on invoices have been asked for since March 2012 (516 votes) and progress payments since October 2012 (252 votes); the vendor reports deposits live in six countries and fuller progress billing not yet covered4. On an ERP vendor's board, invoicing a job in stages of 30%, 30% and 40% has 136 votes and no reply since 2019, and a request for more than one prepayment invoice per order was answered that it is not on the roadmap18. A third vendor parks progressive invoicing as maybe later22.

Figure 3

Requests about lines and money in parts wait for years

Years each request had been open on 13 November 2026, on three vendors' idea boards

Years each request had been open on 13 November 2026, on three vendors' idea boards
MeasureValue
Deposits on invoices (in development)14.6 years
Progress payments on invoices (in development)14.1 years
Copy part of a quote to an invoice (submitted)11.2 years
Bill what was received, not what was ordered (under review)9.3 years
Purchase order lines to a project (accepted, no date)8.9 years
Order of posting for drop shipments (under review)7.9 years
Invoice a job in stages (needs votes)7 years
From the date each request was posted to 13 November 2026, our arithmetic, with the status the board showed that day42218. On one board the date is the earliest on the idea's page, which may be the date it was first posted on an older forum.

Construction shows why. A standard pay application, as a US architects' institute publishes it, carries the contract sum, the work completed and the materials stored to date, the retainage, the previous payments and the change orders, line by line against a schedule of values, and an architect certifies the amount before the owner pays24. It is a cumulative document, not an ordinary invoice.

Retention, the part of each payment held back until the work is done, follows rules that differ by country and change. US federal fixed-price construction contracts allow at most 10% to be retained while progress is unsatisfactory25. In a 2016 survey for the UK government, contractors reported an average retention of 4.8% of contract value, and 71% of those with retentions held had been paid them late26. In July 2026 the UK government proposed to ban deducting and withholding retention payments in construction contracts27.

This is also where the add-ons cost most. In one open-source ERP's store, progress billing returns 70 add-ons; a job-costing invoice add-on sells at USD 308.15 with 94 purchases, and a contracting bundle at USD 2,778.97 with 663.

Where does a shaped system break?

At the next version. In the one ecosystem where it can be counted, every annual version of an open-source ERP opens between 178 and 231 migration issues, one per repository, and between 2,955 and 4,270 pull requests that each move one module5. Two years after one version, 82.7% of the modules listed for it had been moved; one year after the next, 52.4%5.

Figure 4

A year after a new version, half the community's modules had been moved to it

Share of the modules listed for an annual version that had been moved to it, in one open-source ERP's community

Share of the modules listed for an annual version that had been moved to it, in one open-source ERP's community
MeasureValue
Version 19, about one year after52.4%
Version 18, about two years after82.7%
Ticked boxes in the community's migration tracking issues, one issue per repository, read on 13 November 2026: 1,299 of 2,481 modules for version 19 and 2,141 of 2,590 for version 18, our arithmetic. A ticked box means a move was merged or claimed under that repository's practice5.

The vendor's own documents put the rule plainly: a database with custom modules cannot be upgraded until a version of those modules exists, and the maintenance of customer-specific code is charged per 100 lines a month628. A paid industry add-on in its store states its own maintenance estimate, USD 492.00 a month3. Outside that ecosystem the evidence is threads. On another open-source ERP's forum, one upgrade stopped because a field already held data of another type, and another because existing data broke a new rule that values be unique15.

At the limits, and at their price. One vendor lists extra database capacity at USD 40.00 per GB a month, and the most voted idea on its platform board, 204 votes, asked not to pay for the storage of system tables the customer cannot control718. Another vendor's editions allow no lookup fields on the free edition and up to fifteen per module on the top one, roll-ups only in the upper editions and a test copy of the system only in the top two8. In an open-source ERP, a form refused new fields after about fifty custom ones, and deleting fields did not free the space15.

  • Testing before it goes liveWhere a test environment exists, people ask for more of them, for copies with masked data and for a clean way to move a model between them: 53 votes for a copy with randomized data, under review since 201918.
  • Undoing a changeRolling back a deployed extension has 88 votes on an ERP board18. Undoing a lead conversion was refused on a CRM board17. No board we read offers a general way to undo a change to the configuration.
  • Knowing where a field is usedOn the largest CRM board, "where is this field used" drew 36,840 points before it was delivered2. Elsewhere it shows only as a symptom: people who cannot delete an object because they cannot find what depends on it18.
  • Keeping history when data movesOriginal dates lost when notes were reassigned drew 110 votes and was declined18. Importing into multi-value fields has been asked for since 2014 and is still marked as being worked on17; filling the links between records on import was asked for on an open-source tracker20.

What do people want before AI changes their system?

A person who can stop it, a record of what it did, and a way back. In a survey of 48,340 people in 47 countries, 46% said they were willing to trust AI systems. Asked what would make them trust one more, 84% named a person's ability to correct, override or challenge its output, and 82% knowing who is accountable when something goes wrong9.

Figure 5

Most people would trust AI more if a person can override it

Share who would be more willing to trust an AI system if it met each condition

Share who would be more willing to trust an AI system if it met each condition
MeasureValue
A person can correct, override or challenge it84%
Its accuracy and reliability are monitored84%
It is clear who is accountable if something goes wrong82%
An independent third party assures it74%
48,340 people in 47 countries, surveyed online from November 2024 to mid January 2025, by a university with a consulting firm; four of the conditions the study asked about9. The question is about AI systems in general, not about business software.

Executives say the same about agents. In a survey of 1,500 executives at organizations with more than USD 1 billion in annual revenue, 74% said the benefits of human oversight outweigh its costs29.

Practitioners read the failures as failures of access, not of the model. In a thread of 1,032 comments on an AI agent that deleted a company's production database, the replies dwell on a credential that could do anything, backups kept beside the data, and no separate test environment; one reads "The real issue is no actual backups."30 In a forum of people who build automations, the line drawn was simple: "the agent can draft it or prep it, but a human fires it"31.

What we did not find is demand for AI that builds the model itself. On the issue trackers of the open products we read, no user request for AI that creates fields, objects or workflows had more than a handful of reactions; the items about AI with the most were the makers' own changes2320.

What do teams, phones and templates need?

A record that shows each kind of work its own fields, a phone that works without a connection, and templates that stay in step. On a work-management vendor's board, fields that belong to one kind of work, not to every record in a list, drew 2,093 votes before they shipped in 2026. Permissions on single fields drew 2,163 and shipped only on the two top plans, which the comments that followed objected to10.

On the phone, offline use leads every board with a mobile section. The work-management board's top mobile request has 4,432 votes10; an older request for offline mode on a database product has 121 likes and 219 replies32; a thread asking an open-source ERP to work offline has 19,148 views and replies across eleven years15. Next come photos, scanning and signatures captured in the field: a camera barcode scanner drew 334 votes on one ERP vendor's board, photos on warehouse work 230. Editing document lines on a phone has few requests, the largest with 111 votes18.

A template is usually a one-time copy, and that is the complaint. Applying changes of a master template to everything made from it has 1,990 votes; it was posted in December 2019 and is marked for the future; a commenter in 2026 asked "What is the point of a template if changes are not propagated???"10 On the boards we read, no high-count request asks for more industry templates.

Figure 6

One in five industry add-ons stops at an older version

Industry add-ons in one ERP's store, by the newest version each is listed for

Industry add-ons in one ERP's store, by the newest version each is listed for
MeasureValue
The newest version55.66%
The version before it24.9%
An older version19.44%
All 751 listings of the store's industries category, read on 13 November 2026: 418, 187 and 146 listings, our arithmetic3. A listing may also run on versions it does not name.

Industry add-ons show the same gap from the other side. Of the 751 listings in the industries category of one ERP's add-on store, 747 have no rating, and where a purchase count is shown the median is three3. A commenter who ran that ERP wrote that the upgrade path for third-party and custom add-ons "was not defined"33.

What this does not show

  • A vote is not a sample. Every board counts the people who found it and chose to click, and each counts differently: points, votes, likes, reactions. We compare counts within one board, never across boards, and read them for order and age, not for share.
  • Several places could not be read. Every request to the largest discussion forum was sent to a login page, so no thread from it is here. The idea boards of three ERP vendors refused us or needed a browser we did not use for them, and a practitioner publication's admin surveys refused us.
  • A purchase is a sale, not a need. Add-on counts show what people paid someone else to build. The core product may do part of it, and a module that sells little may sell little because the core already does it.
  • The evidence on who customizes is old or thin. The share of projects with no customization comes from a consultancy's web poll of 2016 and 2017. The reasons come from two case companies.
  • The AI evidence is about AI in general. The surveys ask the public and executives about AI systems and agents, not about a system that changes a data model. The incidents practitioners discuss are about coding agents and infrastructure.
  • Only construction has official evidence of an industry difference. For distribution, manufacturing, services and field work, the evidence is the forum and tracker of one open product and the counts of one add-on store.
  • We sell business software. Every product whose board we read is one we could be compared with. Read the selection of requests, and our reading of them, with that in mind.

What we build from this

Each need below is one the evidence names. Beside it is what SalexHub does about it today, with the page that shows it. Where we have nothing to show, the row says so.

  • Records of your own, with their links and rules

    Add the kinds of record only your business keeps, with their properties and the links between them. Formulas and roll-ups work out totals across linked records, and a rule set once holds however a record is written.

    Data model

  • A field's type changed without losing what it holds

    Ask the Agent to turn a text field into a number, and it shows what each value becomes before it does.

    Data model

  • An invoice in parts, from what was agreed

    The Agent drafts the invoice from the quote your customer accepted, with the same lines. Invoicing in parts, the quote counts what is left. You issue it.

    Invoice an accepted quote

  • A receipt that leaves the rest of a line open

    Receive on the purchase order: it drafts every open line, you enter what was counted, and the rest stays open until it arrives.

    Receive a delivery against the order

  • Credit against chosen lines

    A credit note takes the lines you choose and a reason, at the invoice's own rates. The invoice is never edited.

    Correct an issued invoice with a credit note

  • A bill checked against what arrived

    A supplier's bill is posted against the goods received. Billing past what was received is refused.

    Pay suppliers only for what arrived

  • History brought in, and a way back

    Import from a spreadsheet or another CRM, see how many rows are ready before anything is written, and undo the whole import in one action.

    Bring your customers in

  • Proof in numbers

    We have not measured what any of this saves in hours or in add-ons not bought. Until we do, we make no claim about it.

    Nothing to show yet

References

Grouped by the weight of the evidence, the heaviest first. Open a group to see its sources.

Peer-reviewed studyPublished in a journal after review by other researchers.01
  1. 11Going beyond 'misfit' as a reason for ERP package customisation

    Light. Computers in Industry 56(6), 606 to 619, 2005.

    Who was askedTwo companies that customized an ERP package; interviews and documents. Read in the author's version.

    Back to the text
Official sourceStatistics or rules published by a public authority.04
  1. 13G-Cloud 15, Cloud support: supplier service pages and rate cards

    UK Crown Commercial Service and Government Digital Service. Digital Marketplace, applytosupply.digitalmarketplace.service.gov.uk, Read 13 November 2026.

    Who was askedRate cards of 12 suppliers of CRM and ERP implementation services that list a business architect, from the first results of three searches. Rates in GBP per day.

    Back to the text
  2. 25FAR 52.232-5, Payments under Fixed-Price Construction Contracts (May 2014)

    US General Services Administration, Department of Defense and NASA. Federal Acquisition Regulation, acquisition.gov, May 2014.

    Back to the text
  3. 26Retention payments in the construction industry

    Pye Tait Consulting for the UK Department for Business, Energy and Industrial Strategy. gov.uk, with the consultation of October 2017, October 2017.

    Who was asked506 contractors in England, February to April 2016, and 419 construction clients, March to April 2016.

    Back to the text
  4. 27Late payments: tackling poor payment practices, government response

    UK Department for Business and Trade. gov.uk, 24 July 2026.

    Who was asked867 responses to a consultation held from 31 July to 23 October 2025.

    Back to the text
Independent surveyA survey by an organization that sells nothing to the people it asked.01
  1. 09Trust, attitudes and use of artificial intelligence: A global study 2025

    Gillespie, Lockey, Ward, Macdade and Hassed. The University of Melbourne and KPMG, 2025.

    Who was asked48,340 people in 47 countries, surveyed online from November 2024 to mid January 2025. Led by a university, with a consulting firm.

    Back to the text
Public requestsWhat users ask for in public, on a vendor's idea board or forum, an issue tracker or a practitioners' thread, counted as the page shows it.17
  1. 02IdeaExchange: all ideas, sorted by points; searches for line items, field history and sandboxes

    Salesforce. ideas.salesforce.com, Read 13 November 2026.

    Who was askedThe 50 most voted ideas of all time, posted 2006 to 2022, with points, dates and status as the board showed them.

    Back to the text
  2. 04Xero Product Ideas: invoices and quotes; purchase orders, bills and inventory; projects

    Xero. productideas.xero.com, Read 13 November 2026.

    Who was askedTop-voted ideas of three forums and 16 idea pages, with votes, earliest date and status.

    Back to the text
  3. 05Migration to version 18.0 and 19.0: tracking issues and pull requests; module lists of the workflow and invoicing repositories

    Odoo Community Association. github.com/OCA, Read 13 November 2026.

    Who was asked218 and 226 migration tracking issues listing 2,590 and 2,481 modules; issue and pull request totals for versions 14.0 to 19.0.

    Back to the text
  4. 10Feature requests and the mobile app board

    ClickUp. feedback.clickup.com, Read 13 November 2026.

    Who was asked18 searches sorted by votes and 10 request pages, with votes, dates, status and staff comments.

    Back to the text
  5. 12Show HN: I've been building an ERP for manufacturing for the last 3 years

    Hacker News. news.ycombinator.com, item 44792005, 4 August 2025.

    Who was asked322 points, 158 comments.

    Back to the text
  6. 15Frappe Forum: threads on implementation, drop shipping, upgrades, field limits and offline use

    Frappe. discuss.frappe.io, Read 13 November 2026.

    Who was askedThreads with their views, likes, posts and dates, 2013 to 2026; among them topics 165374, 95044, 33878, 76868 and 3204.

    Back to the text
  7. 16HubSpot Ideas, sorted by votes

    HubSpot. community.hubspot.com, Read 13 November 2026.

    Who was askedThe 60 most voted ideas, with votes, replies, dates and status.

    Back to the text
  8. 17Zoho CRM ideas

    Zoho. help.zoho.com community, Read 13 November 2026.

    Who was askedAll 2,756 ideas of the CRM category, ranked by likes, with comments, dates and status.

    Back to the text
  9. 18Dynamics 365 and Power Platform ideas: Sales, Dataverse, Admin center, Business Central

    Microsoft. experience.dynamics.com/ideas, Read 13 November 2026.

    Who was askedTop lists of four forums and searches of about ten ideas each, with votes, dates, status and vendor replies.

    Back to the text
  10. 20nocodb/nocodb issues, sorted by reactions

    NocoDB. GitHub, Read 13 November 2026.

    Who was askedIssues with their reactions, comments, dates and state.

    Back to the text
  11. 21Help forum: threads on invoicing several orders, delivery notes on invoices, drop shipping and quotation revisions

    Odoo S.A.. odoo.com/forum, Read 13 November 2026.

    Who was askedThreads with their views, votes, answers and dates, 2013 to 2026.

    Back to the text
  12. 22Zoho Books and Zoho Inventory ideas

    Zoho. help.zoho.com community, Read 13 November 2026.

    Who was asked1,050 ideas of the two categories, with likes, comments, views, dates and status.

    Back to the text
  13. 23frappe/erpnext and frappe/frappe issues and pull requests

    Frappe. GitHub, Read 13 November 2026.

    Who was askedIssues found by search, with their reactions, comments, dates and state.

    Back to the text
  14. 30An AI agent deleted our production database. The agent's confession is below

    Hacker News. news.ycombinator.com, item 47911524, 26 April 2026.

    Who was asked860 points, 1,032 comments.

    Back to the text
  15. 31N8n users running AI agents: where do you still keep a human approval step?

    n8n community. community.n8n.io, topic 303282, 14 July 2026.

    Who was asked8 posts, 313 views.

    Back to the text
  16. 32Legacy product ideas: FR: Offline mode

    Airtable. community.airtable.com, 12 April 2016.

    Who was asked121 likes, 219 replies.

    Back to the text
  17. 33Odoo: Open-Source ERP

    Hacker News. news.ycombinator.com, item 46439993, 31 December 2025.

    Who was asked76 points, 69 comments.

    Back to the text
Vendor documentationWhat a vendor publishes about its own product: its limits, prices and documented behavior.08
  1. 03Odoo Apps store: searches by ability, the Industries category, and add-on pages

    Odoo S.A.. apps.odoo.com, Read 13 November 2026.

    Who was askedNumber of add-ons per search, price as shown in US dollars and the store's purchase counter for the first results; all 751 listings of the Industries category.

    Back to the text
  2. 06Upgrade

    Odoo S.A.. Odoo 18.0 documentation, administration, Read 13 November 2026.

    Back to the text
  3. 07Power Apps pricing

    Microsoft. microsoft.com, Read 13 November 2026.

    Who was askedDatabase capacity add-on, USD 40.00 per GB a month, paid annually; the page notes that prices may differ at checkout.

    Back to the text
  4. 08Zoho CRM: compare editions

    Zoho. zoho.com, Read 13 November 2026.

    Who was askedLimits per edition: custom modules, fields, lookup and roll-up fields, sandbox, storage.

    Back to the text
  5. 14Odoo Success Packs

    Odoo S.A.. odoo.com, Read 13 November 2026.

    Who was askedPrices as shown in US dollars to the reading location, for returning customers.

    Back to the text
  6. 19Define rollup columns that aggregate values

    Microsoft. Microsoft Learn, Power Apps, 30 April 2024.

    Back to the text
  7. 24Summary: G702-1992, Application and Certificate for Payment

    AIA Contract Documents. help.aiacontracts.com, Read 13 November 2026.

    Who was askedThe publisher's own summary of its standard form.

    Back to the text
  8. 28Odoo Enterprise Subscription Agreement

    Odoo S.A.. Odoo 18.0 documentation, legal, Read 13 November 2026.

    Back to the text
Vendor surveyA survey run or paid for by a company that sells to the people it asked.02
  1. 012017 ERP Report

    Panorama Consulting Solutions. panorama-consulting.com, 2017.

    Who was asked342 respondents to a poll on the publisher's website, March 2016 to February 2017. The publisher sells ERP consulting.

    Back to the text
  2. 29Rise of agentic AI: How trust is the key to human-AI collaboration

    Capgemini Research Institute. capgemini.com, 2025.

    Who was asked1,500 executives at director level and above, at organizations with more than USD 1 billion in annual revenue in 14 countries, surveyed in April 2025. The publisher sells AI services.

    Back to the text
  • Contains public sector information licensed under the Open Government Licence v3.0: the retention research and the late payments consultation of the UK government, © Crown copyright 2017 and 2026, and the G-Cloud 15 pages of the Digital Marketplace. The licence: https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/
  • The University of Melbourne and KPMG study is licensed CC BY-NC-SA 4.0 by its authors; the four values drawn from it are restated as facts in a figure of our own.

Changes

  • 13 November 2026First published.